Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 6 results ...

Bai, Y, Kim, S H and Burkett, W R (2007) Enhancing the capability of rapid bridge replacement after extreme events. Engineering, Construction and Architectural Management, 14(04), 375–86.

Cameron, I, Gillan, G and Duff, A R (2007) Issues in the selection of fall prevention and arrest equipment. Engineering, Construction and Architectural Management, 14(04), 363–74.

  • Type: Journal Article
  • Keywords: construction equipment; construction industry; health and safety; United Kingdom
  • ISBN/ISSN: 0969-9988
  • URL: http://www.emeraldinsight.com/10.1108/09699980710760676
  • Abstract:
    Purpose – The research objectives are to investigate current methods of fall protection, identify issues in their selection and use, and produce guidance on best practice for designers and constructors. Design/methodology/approach – A steering group with both health and safety and production experience directed a variety of data collection methods: interviews with industry specialists to assist in identifying the significant issues in fall protection and selecting fall protection systems; study of published research, legislation, codes of practice, and system technical data; focus groups to investigate both generic and system-specific issues; and visits to manufacturers, suppliers, contractors' offices and sites, to observe and discuss systems in development, planning, erection and operation. Findings – This paper deals with all the general issues in equipment selection: a hierarchy of selection; legislative guidance; interaction with the structure; impact on site operations; rescue of fallers; issues specific to maintenance and refurbishment; and costs arising from equipment selection. Originality/value – The paper provides a summary of the most important issues contained in the full Health & Safety Executive report of the research, the only comprehensive source of such practical guidance.

Eriksson, P E and Laan, A (2007) Procurement effects on trust and control in client-contractor relationships. Engineering, Construction and Architectural Management, 14(04), 387–99.

Fernie, S and Thorpe, A (2007) Exploring change in construction: supply chain management. Engineering, Construction and Architectural Management, 14(04), 319–33.

Jones, K and Kaluarachchi, Y (2007) Operational factors affecting strategic partnering in UK social housing. Engineering, Construction and Architectural Management, 14(04), 334–45.

Ling, F and Lim, H L (2007) Foreign firms' financial and economic risk in China. Engineering, Construction and Architectural Management, 14(04), 346–62.